EAI was contacted by RealtyLink to provide continuing asbestos abatement and selective structural demolition of the former Oak Ridge Mall in Oak Ridge, Tennessee. The facility encompassed over 550,000 square feet of retail space.  Structural separation occurred between the Belk & JCPenney retail facilities – while keeping them operational.

Prior to demolition approximately 70,000sf of asbestos-containing flooring materials had to be abated. Demolished materials were re-purposed, predominantly steel and concrete/inert materials. The inert materials were addressed via a mobile on-site crusher and produced approximately 12,000 tons for utility trench re-use on site.

The project was completed; including slabs & footers in nine (9) weeks.